Tuesday, October 6, 2009

Tectonic Shift... Aftermath

Poor little Lulu has to find the most economical solution to deal with the popped-up tiles.
I knock, knock, knock the popped-up tiles




I put thick plastic sheet on top of the cement.
I put cloth on top of the thick plastic sheet.

How's my art work? Cost = RM 0.00. Manhour = 0.45 hour. Safety: checked.

2 comments:

  1. Please tell me this is only temporary. It can't cost that much to fix the floor right?

    ReplyDelete
  2. Mario able to fix it for you by charging AUD60/man hour.

    ReplyDelete